Got the dana 44 painted along with all new bearing and seals. Installed into the jeep. Working on getting the rest of the 11" converted brakes together. Should stop very good over the 9" brakes. Ordered the master rebuild kit along with a new lower cluster, reverse gear, 2nd gear and first gear from Novak conversions for the T-90 Trans. Matt and I got the trans rebuilt today. Found out that the transfer case output shaft is a bit tight. Need to add some more shim plates to get the .002 -.008 i need. Dad has been plugging away with body work. The drivers side fender is almost done. He started working on the back quarter panels.