Friday, November 5, 2010
Oct. 16---Nov. 5 (Day 111)
With the SF Giants winning the World Series my Jeep was put on hold, Although my dad kept plugging away at it. The dash/cowl is almost finished, The new battery box has been welded into the dash, the battery box lid got fixed and primer. 52 holes have been welded up on the back wheel wells. The Firewall had over 15 holes to fill up, The transmission pan had a big cutout in it to clear the old Buick v6 and t18 trans, Made a sheet metal piece and rolled in to fit into the cutout area. Made a new rear tail light holder for the driver side, the original was missing.Took the frame,cross member and springs to Vaider for sand blasting. New bolts welding in for rear shocks, welded up a few cracks that the sand blast exposed before primer. Today 11-05 we shot the primer on the frame. Tomorrow we will shoot the OD Semi Green.
















Labels:
M38
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment